RSR Cargo

Guaranteed Delivery Appointment System (GDAS)

The Objective: Modernizing rail and multimodal freight by replacing rigid shuttle timetables with confirmed delivery appointments that synchronize capacity, slots and resources across the intermodal chain. Client-oriented, synchronized in real-time across upstream transport, terminal, rail, and the last mile.

The MGPS Solution: RSR CARGO

— A Cloud-native platform orchestrating a guaranteed appointment thanks to:

• Multi-stakeholder commitment (carriers, terminals, rail operators) via digital contracts.
• Real-time feasibility engine (capacities, slots, train paths).
• Dynamic resource booking.
• Live tracking & alerts + proactive reallocation in case of contingencies.

1. Client request (date/time/constraints)
2. Multi-modal feasibility check
3. Formal commitment from all actors
4. Synchronized booking (terminals, train paths, trucks)
5. Real-time tracking & alerts
6. On-time delivery + mission reporting.

Benefits / KPI :
• >95% on-time deliveries
• -30% empty runs (deadhead moves)
• -40% on end-to-end lead time
• -25% CO2 footprint on rail/multimodal flows.

THE CHALLENGE

• Fragmented chain, static schedules, empty runs (>30%), unguaranteed delays.

The “SHUTTLE” optimizes the operator, not the client promise.

Result: delays, downtime, loss of competitiveness against road transport.

OPTIMIZATION

— More than software: physical optimization via AGVs

RSR CARGO interfaces with terminal AGVs to load 4 wagons in <15 min, making the software promise operational (controlled dwell time, reliable train departure).

• Web Front-end (request, tracking, KPIs, notifications),
• Open APIs (TMS/WMS/TOS interoperability),
• Scalable Cloud Back-end (PostgreSQL, real-time events),
• Dashboards (reliability, delays, CO2, empty runs).

• Scoping & Design (Weeks 1-5)
• Portal development, feasibility, tracking/alerts, reporting (Weeks 4-11)
• Partner integrations & tests (Weeks 9-14)
• Go-live & support (Weeks 15-19). Target duration of 5 to 6 months for a 1st corridor.

“This project began in 2023 and is set to materialize in the coming years thanks to the involvement of major SUPPLY CHAIN players.”

Looking to optimize your port operations and boost productivity today?